Specification, Selection and Procurement
Writing AHU specifications, reviewing selections and submittals, and procuring custom equipment.
comparisons
- Custom vs Semi-Custom vs Catalog AHUsCompares unit categories on flexibility, lead time, cost and certification; does not cover procurement methods.
- Performance-Based vs Prescriptive AHU SpecificationsCompares specifying outcomes versus construction details and risks of each; does not cover basis of design.
- Design-Build vs Design-Bid-Build Procurement for AHUsCompares delivery methods and their effect on AHU selection and risk; does not cover spec types.
- Compact vs Low-Velocity AHUs: Footprint vs EfficiencyCompares smaller high-velocity units with larger low-velocity units on energy and space; does not compute life-cycle cost.
how tos
- How to Write an AHU Specification (MasterFormat 23 73 00)Steps to structure a Division 23 AHU specification section; certification wording is in codes.
- How to Plan a Factory Witness TestSteps to define, schedule and attend factory run tests for airflow, leakage and sound; site commissioning is in installation.
- How to Apply Design Margins Without OversizingSteps to add sensible safety factors to airflow, static and capacity without compounding; does not cover turndown.
- How to Compare and Normalize AHU BidsSteps to level competing quotes for scope, performance and options; life-cycle cost is a separate calculation.
- How to Use Manufacturer BIM and Revit Models for AHUsSteps to import, check and coordinate manufacturer models in design; does not cover laser scanning.
explainers
- How to Read an AHU Selection ReportExplains the sections of a manufacturer's selection printout and what to verify; submittal review is a separate checklist.
- Basis of Design, Approved Equals and SubstitutionsExplains how basis of design and substitution clauses work for AHUs; does not cover bid comparison.
- AHU Lead Times and Procurement TimelinesExplains drivers of custom AHU lead time from submittals to shipment; retrofit shutdown planning is in retrofit.
- Shipping Custom AHUs Across the Canada-US BorderExplains CUSMA origin, customs and permit considerations for cross-border AHU deliveries; domestic content rules are in codes.
- Embodied Carbon and EPDs for Air Handling UnitsExplains environmental product declarations and embodied carbon reporting for AHUs; LEED credits are in codes.
- Delegated Design Responsibilities in AHU ProcurementExplains what the manufacturer, engineer of record and contractor each own (seismic, controls, structure); does not cover warranties.
- Steel Price Escalation and Tariff Clauses in AHU ContractsExplains escalation clauses and tariff exposure for custom equipment; domestic content requirements are in codes.
checklists
- AHU Submittal Review ChecklistChecklist for reviewing drawings, performance, electrical and options on AHU submittals; code documentation is in codes.
- AHU Warranty Terms ChecklistChecklist of warranty start, coverage, extended options and conditions to negotiate; does not cover service contracts.
- Information a Manufacturer Needs to Quote a Custom AHUChecklist of airflow, conditions, components, electrical and site data for an accurate quote; does not cover schedule fields.
calculations
- AHU Life-Cycle Cost AnalysisCalculates first, energy, maintenance and replacement costs over unit life; bid normalization is separate.
- Estimating AHU Weight and Dimensions Early in DesignCalculates approximate length, cross-section and weight from airflow and components; does not cover structural review.
- Comparing Fan Energy Between AHU BidsCalculates annual fan energy differences between competing selections at part load; full life-cycle cost is separate.
troubleshootings
- When Value Engineering Causes AHU Performance ProblemsDiagnoses performance issues traced to VE substitutions (smaller casing, fewer rows, lower leakage class); does not cover spec writing errors.
- Common AHU Specification Errors and ConflictsDiagnoses contradictory or outdated spec clauses that cause RFIs and change orders; VE substitutions are separate.