marketdata centers
Cooling air for data halls
Data halls carry large sensible loads around the clock. We build air handlers with redundant fan arrays and large coils that keep the IT load cool through any single failure.
001the challenge
What data centers asks of an air handler.
01
High sensible load
Almost all of the heat is sensible, so coils are large and dehumidification is minimal.
02
Continuous duty
The unit runs 8,760 hours a year, so efficiency at part load matters more than at peak.
03
No single point of failure
Fans, controls and power have to be redundant to meet the facility's tier rating.
002what we build
What usually goes in the box.
- EC fan arrays with N+1 or N+2 redundancy
- Large-face chilled water coils at low face velocity
- Economizer and evaporative options
- Redundant controls and power feeds
Guides for data centers projects
- explainerASHRAE TC 9.9 Thermal Guidelines for Data Centers
- comparisonCRAH vs Custom AHU vs Fan Wall for Data Centers
- comparisonHot Aisle vs Cold Aisle Containment
- explainerAirside Economizers for Data Centers
- explainerIndirect Evaporative Cooling Units for Data Centers
- calculationCalculating the Cooling System's Contribution to PUE
Ready to build the unit your project actually needs?
Send a schedule, a drawing or a photo of the unit you are replacing. An application engineer calls back within one business day.