marketlaboratories
Makeup air and exhaust for laboratories
Labs run once-through air at high air change rates, so the makeup air unit and the exhaust fans are the building. We size both together.
001the challenge
What laboratories asks of an air handler.
01
Once-through air
Every cubic foot exhausted has to be replaced with conditioned outdoor air, often at 100% outdoor air.
02
Room pressure control
Supply has to track exhaust closely as fume hood sashes open and close.
03
Exhaust re-entrainment
Exhaust has to leave fast and high so it doesn't come back in at the intake.
002what we build
What usually goes in the box.
- Makeup air units sized for 100% outdoor air
- High-plume exhaust fans
- Coated coils and stainless drain pans
- Run-around or heat pipe recovery where cross-contamination is a concern
Guides for laboratories projects
- explainerLaboratory Ventilation Under ANSI/ASSP Z9.5
- explainerSetting Laboratory Air Change Rates
- how-toHow to Supply Makeup Air for Fume Hood Exhaust
- explainerISO 14644 Cleanroom Classes Explained
- calculationCalculating Cleanroom Airflow and Air Change Rates
- explainerGMP Pharmaceutical AHU Design Principles
Ready to build the unit your project actually needs?
Send a schedule, a drawing or a photo of the unit you are replacing. An application engineer calls back within one business day.