Custom Air EquipmentAn HSM Company

SPEC-GUIDESpecification, Selection and Procurement

AHU Equipment Schedule: Required Fields

4 min read · Reviewed by the Custom Air Equipment applications team

The equipment schedule on the mechanical drawings is where an air handler's performance is fixed: a complete schedule gives every bidder the same airflow, pressure, coil, fan, filter, electrical and physical data, while the specification text describes construction; missing or ambiguous fields are the most common source of quote qualifications.

Why the schedule carries the numbers

Schedules are read by everyone: estimators, manufacturers, electrical engineers, structural engineers, balancers and commissioning agents. Putting performance numbers in one table, rather than scattered through specification text, keeps them consistent and makes changes visible on revisions. The specification should point to the schedule for performance; structuring that text is covered in how to write an AHU specification.

For custom units, one column per unit tag with many rows of fields usually reads better than one row per unit with dozens of columns.

General and airflow fields

FieldUnitsNotes
TagMatches drawings and controls
Location and area servedRoom or roof, zones served
Indoor or outdoor
ArrangementReference to a detail or diagram of section sequence
Supply airflow, maximum and minimumCFM (L/s)State standard or actual air basis
Minimum outdoor airflowCFM (L/s)Per ventilation calculation
Return and exhaust airflowCFM (L/s)If unit includes return or exhaust fans
External static, supply and returnin. w.c. (Pa)Separately, not combined
Site elevationft (m)Needed for density correction

Fan fields

FieldUnitsNotes
Fan typePlenum, housed, fan array
Number of fans and redundancyFor example 4 fans, N+1
Total static pressure, maximumin. w.c. (Pa)Or leave to manufacturer with a maximum
Maximum brake horsepower or input powerbhp or kWGives a fan energy ceiling
Minimum FEI or efficiencyWhere required by code or owner
Motor horsepower, type, efficiencyhp (kW)Induction with VFD, EC or PM
Speed controlVFD per fan, common VFD, integral EC

Sample note: "Fan array shall deliver scheduled supply airflow at scheduled external static with any one fan out of service. Brake horsepower shown is maximum at design with all fans operating and filters at mid-life."

Coil fields

Provide one block per coil:

FieldUnits
Coil type and fluidChilled water, hot water, steam, DX, glycol type and percentage
Airflow through coilCFM (L/s)
Maximum face velocityfpm (m/s)
Entering air DB / WB°F (°C)
Leaving air DB / WB°F (°C)
Total and sensible capacityMBH (kW)
Entering and leaving fluid temperature°F (°C)
Fluid flowgpm (L/s)
Maximum air pressure dropin. w.c. (Pa)
Maximum fluid pressure dropft w.c. (kPa)
Electric heatkW, stages, voltage

For steam coils, give steam pressure at the coil inlet instead of fluid temperatures. For DX coils, give suction temperature, refrigerant and the number of circuits or stages.

Filters, recovery and humidification

FieldUnitsNotes
Filter stages and ratingsMERV per ASHRAE 52.2, or otherPrefilter and final separately
Filter face velocity, maximumfpm (m/s)
Filter pressure drop for selectionin. w.c. (Pa)State clean, mid-life or dirty basis
Energy recovery typeWheel, plate, runaround
Recovery effectiveness%Sensible and latent, at stated conditions
Humidifier capacitylb/h (kg/h)With type and steam or water source

Electrical and physical fields

FieldUnitsNotes
Voltage / phase / frequencyV / ph / HzConfirm with electrical drawings
Minimum circuit ampacityAOften filled in from basis of design and verified at submittal
Maximum overcurrent protectionA
Power connectionSingle-point or multiple
Maximum length, width, heightin. (mm)Space envelope available
Maximum operating weightlb (kg)From structural coordination
Maximum shipping section sizein. (mm)For access routes
Casing leakage and deflection classIf not covered in specification
Sound power limitsdB by octave bandDischarge, inlet, radiated
Basis of designManufacturer and model

Damper, controls and accessory fields

  • Damper locations, maximum leakage rating and actuator fail position (open, closed or last position).
  • Controls scope: factory-mounted, factory-programmed, or field-installed.
  • Freeze protection device type and location.
  • Smoke detector requirements and who furnishes them.
  • Service lights, receptacles and power source.
  • Vibration isolation type and minimum static deflection.
  • Seismic certification required: yes or no.

These fields are often left to the specification, but putting them on the schedule makes differences between units visible at a glance. A project with one hospital unit requiring seismic certification and several office units that do not, for example, is far clearer when each column states it, rather than relying on bidders to cross-reference tags against a paragraph in Part 2 of the specification.

  • Coating or special material requirements for corrosive or coastal locations.

Notes that prevent RFIs

Every schedule benefits from a short list of general notes. Sample language:

  1. "Airflows are at standard air density. Manufacturer shall correct performance to site elevation."
  2. "Coil capacities are minimums at scheduled entering conditions. Leaving air conditions shall be met or exceeded."
  3. "Filter pressure drop for fan selection shall be taken at the midpoint between clean and recommended final resistance."
  4. "Maximum dimensions are the space available and include no allowance for service clearance."
  5. "Electrical data shown is for the basis of design. Contractor shall coordinate any differences."

Do not leave fields blank without explanation. A blank field is read as "not required" by some bidders and "to be determined" by others. Write "N/A" or "By manufacturer" so the intent is clear.

The same data underpins a good quote request; see information a manufacturer needs to quote a custom AHU. Field conflicts between schedule and specification are among the issues in common AHU specification errors and conflicts.

Common questions

What should be on an AHU equipment schedule?

Include tag, location, airflows, external static by path, fan type and redundancy, coil performance blocks, filter ratings, energy recovery and humidifier data, electrical data, maximum dimensions and weights, sound limits and basis of design.

Should external static be shown as one value on the schedule?

It is clearer to show supply and return external static separately. A single combined value leaves the manufacturer guessing how to split it between fans or across the unit.

What does a blank field on an AHU schedule mean?

It is ambiguous, which is the problem. Some bidders treat it as not required and others as to be determined. Write N/A or By manufacturer so the intent is clear.

Ready to build the unit your project actually needs?

Send a schedule, a drawing or a photo of the unit you are replacing. An application engineer calls back within one business day.