25 guidesengineering guides
Data Centers and Mission-Critical
Cooling and air handling for data centers, white space and mission-critical rooms.
explainers
- ASHRAE TC 9.9 Thermal Guidelines for Data CentersExplains recommended and allowable classes A1-A4 and their temperature and humidity envelopes; humidity and static discussion is separate.
- Airside Economizers for Data CentersExplains direct outdoor air economizing for white space including filtration and humidity limits; indirect evaporative units are separate.
- Indirect Evaporative Cooling Units for Data CentersExplains IEC units with polymer or aluminum exchangers and DX trim for white space; general plate precooling is in energy recovery.
- Uptime Tier Levels and Cooling RedundancyExplains Tier I-IV concurrent maintainability and fault tolerance for cooling; fan array N+1 sizing is in fans.
- Liquid Cooling and the Residual Air-Side LoadExplains how direct-to-chip cooling changes AHU duty for residual heat; does not cover chilled water versus DX choices.
- Data Center Humidity Limits and Electrostatic DischargeExplains current guidance on low humidity and ESD risk; full thermal classes are a separate guide.
- Gaseous Contamination in Data Centers: ISA 71.04Explains corrosion classes G1-GX and when gas-phase filtration is needed; filter media details are in filtration.
- Designing Data Center Cooling for Cold Canadian ClimatesExplains freeze protection, humidity and mixing considerations at very low outdoor temperatures; economizer hour estimating is separate.
- Thermal Ride-Through After Utility Power LossExplains temperature rise during generator transfer and strategies like stored cooling and fast restart; does not cover redundancy tiers.
comparisons
- CRAH vs Custom AHU vs Fan Wall for Data CentersCompares perimeter CRAHs, central AHUs and fan walls for white space cooling; does not compare containment.
- Hot Aisle vs Cold Aisle ContainmentCompares containment strategies and their effect on AHU supply and return temperatures; does not cover cooling medium.
- Chilled Water vs DX vs Pumped Refrigerant for Data CentersCompares cooling media on efficiency, water use and scalability; does not compare air handler types.
calculations
- Calculating the Cooling System's Contribution to PUECalculates mechanical PUE from fan, pump and chiller power; water usage is a separate metric.
- Calculating Data Center Airflow per kW of IT LoadCalculates cfm per kW from server delta-T and bypass allowance; does not cover economizer hours.
- Calculating Water Usage Effectiveness (WUE)Calculates WUE for evaporative and economizer systems; PUE is a separate metric.
- Estimating Economizer Hours by ClimateCalculates available economizer hours from bin weather data for US and Canadian sites; does not cover cold climate design details.
spec guides
- Specifying Prefabricated Modular Cooling UnitsHow to specify factory-built modular cooling units with integrated controls and testing for data centers; does not cover edge sites.
- Writing a Data Center Air Handler SpecificationWhat to specify for fan walls, redundancy, controls and testing in white space units; modular skids are a separate spec guide.
troubleshootings
- Troubleshooting Low Delta-T From Bypass and RecirculationDiagnoses bypass air and recirculation that lower return temperatures; local hot spots are separate.
- Troubleshooting Data Center Hot SpotsDiagnoses rack-level hot spots from airflow management and pressure issues; room-level bypass is separate.
how tos
- How to Control Fan Walls on Aisle Differential PressureSteps for pressure-based fan wall control with containment; general fan array staging is in controls.
- How to Cool Electrical and UPS RoomsSteps for sizing and configuring cooling for switchgear, UPS and battery rooms; white space is separate.
- How to Cool Edge and Small Data CentersSteps for selecting cooling for edge sites and modular rooms with limited space and service; hyperscale white space is separate.
checklists
- Data Center Cooling Commissioning Levels L1 to L5Checklist of what each commissioning level verifies for cooling equipment; general commissioning process is in installation.
- Data Center Cooling Design ChecklistChecklist of loads, redundancy, containment, economizer and controls decisions; does not cover commissioning.
Ready to build the unit your project actually needs?
Send a schedule, a drawing or a photo of the unit you are replacing. An application engineer calls back within one business day.