SPEC-GUIDEData Centers and Mission-Critical
Writing a Data Center Air Handler Specification
A white space air handler or fan wall specification should state performance at the server-facing conditions, require fan-level redundancy with proof, define how fans are driven and controlled, and set a factory test regime with acceptance criteria. Those four areas decide whether the unit can hold rack inlet conditions through failures for its whole life.
Scope and structure
Most projects place these units in a custom air handling section based on MasterFormat 23 73 00, with data center requirements added. The general section structure is described in writing an AHU specification under 23 73 00. This guide covers fan walls and central white space units. Fully integrated factory modules with their own electrical distribution and skid packaging are covered separately in specifying prefabricated modular cooling units.
Performance
Define the operating envelope in terms the data hall will experience. Sample language, with bracketed project values:
- Each unit shall deliver [__ cfm] of supply air at [__ in. w.g.] total static pressure, including coils at [wet] [dry] condition and filters at [mid-life] [final] pressure drop.
- Sensible cooling capacity shall be not less than [__ kW] with return air at [__°F] and supply air at [__°F], with chilled water at [__°F] supply and [__°F] return [glycol concentration __%].
- Units shall operate stably across an airflow range of [__%] to [100%] of design, with supply air temperature controlled within ±[1]°F of setpoint.
- Total fan input power at design duty shall not exceed [__ kW], stated as a guaranteed value and verified by factory test.
- Coil face velocity shall not exceed [__ fpm] at design airflow. Coil air pressure drop shall not exceed [__ in. w.g.].
- Sound power levels at the discharge and casing radiated shall not exceed the scheduled octave band values.
Specify fan power at the actual duty point, not motor nameplate horsepower. A fan array can have generous nameplate capacity and still run efficiently; what matters is the measured input power at the operating point.
Fan wall and redundancy
- Fan section shall be a fan array of [__] direct-drive plenum fans with [EC motors] [PM motors with individual VFDs] [induction motors with individual VFDs].
- With any [one] [two] fan[s] out of service, the remaining fans shall deliver [100%] of design airflow at design static pressure, without exceeding [__ dBA] or motor nameplate current.
- Each fan shall have a [backdraft damper] [automatic blank-off device] preventing reverse airflow through an inactive fan. Pressure drop of the device in the open position shall be included in the fan selection.
- Each fan and motor assembly shall be removable from the unit without shutting down other fans and without removing adjacent fans.
- Fans shall be selected with a fan energy index (FEI) of not less than [1.0] at the design duty point. See fan energy index selection.
- Each fan shall be dynamically balanced and the complete fan and motor assembly shall meet [the balance grade and vibration limits specified].
Choosing between N+1 and N+2 is discussed in fan array redundancy: N+1 vs N+2.
Electrical and drives
- Each fan shall be individually protected so that a fault on one fan does not trip others.
- [Where dual power feeds are required:] Fans shall be divided between [two] power feeds such that loss of one feed leaves sufficient fans operating to deliver [__%] of design airflow.
- Drives and EC controllers shall automatically restart after power interruption, with a staggered restart to limit inrush, and shall reach commanded speed within [__] seconds of power restoration.
- Provide a factory-wired control panel listed to UL 508A [and CSA C22.2 No. 286] with a short-circuit current rating of not less than [__ kA].
Controls
- Provide a factory-mounted controller for each unit that executes the approved sequence independently of the building automation system and holds its last valid setpoints on loss of communication.
- Fan speed shall be controlled to [containment differential pressure] [supply airflow] [server inlet temperature] as defined in the sequence of operation, with all fans in the unit running at a common speed.
- On failure of a fan, the controller shall raise the speed of the remaining fans to maintain the controlled variable and shall alarm.
- Provide airflow measurement of total unit airflow by fan inlet [piezometer rings] [airflow station] with accuracy of ±[5]% of reading.
- Controller shall communicate via [BACnet/IP] [Modbus TCP], exposing each fan's speed, power, run status and alarms.
- Provide filter differential pressure, entering and leaving air temperature, and [leaving dew point] sensors, each with stated accuracy.
Construction
- Casing shall be double-wall with thermally broken panels, and casing leakage shall not exceed [__% of design airflow] at [__ in. w.g.].
- Drain pans shall be stainless steel, sloped in two directions.
- Coils shall be removable through [side access] without disassembling the casing.
- Access doors shall be provided at each fan, filter and coil section, with viewing windows and lights at fan sections.
Factory testing
- Each unit shall be run-tested at the factory with all fans operating under control of the unit controller.
- Tests shall include: airflow and total fan input power at design duty; airflow with [one] [two] fan[s] disabled; vibration on each fan; casing leakage; control sequence functions including fan failure response, loss of communication and power restoration.
- Submit the test procedure, with instrument accuracy and acceptance tolerances, [30] days before testing. Submit certified results with unit serial numbers.
- Owner may witness testing with [__] days' notice.
| Often omitted | Consequence |
|---|---|
| Airflow test with a fan disabled | Redundancy claim unproven until site testing |
| Restart time after power loss | Longer temperature excursion during generator transfer |
| Power feed split between fans | Single feed loss stops the whole wall |
| Fan power guarantee at duty | No way to hold supplier to efficiency |
Custom Air Equipment builds fan walls and white space air handlers and runs every unit in its factory, with witness testing available. If you would like a specification reviewed against what can be built and tested, contact an application engineer.
Common questions
What redundancy should a data center fan wall have?
At least N+1 within each unit, proven by a factory test with one fan disabled. Many owners also split fans across two power feeds and require units themselves to be redundant at the hall level.
Should data center AHU fan power be specified?
Yes. Specify a guaranteed maximum fan input power at the design duty point and verify it in the factory test. Nameplate horsepower does not indicate operating efficiency.
How should fans in a data center AHU restart after a power loss?
Automatically, with a staggered restart to limit inrush, reaching commanded speed within a specified time. The restart time affects how much temperature rises during a generator transfer.