25 guidesengineering guides
Retrofit, Replacement and Knockdown
Assessing, rebuilding and replacing existing AHUs, including field-assembled knockdown units.
explainers
- Knockdown AHUs: How Field-Assembled Units Are BuiltExplains knockdown panel and frame construction for units that cannot ship assembled; welded versus bolted designs are compared separately.
- Reusing an Existing Casing: When It WorksExplains assessing casing structure, insulation and leakage for reuse in retrofits; does not cover full rebuilds.
- Hazardous Materials in Old AHUs: Asbestos, PCBs and LeadExplains materials commonly found in legacy AHUs and abatement implications; does not cover structural review.
- Electrical Capacity Upgrades for AHU RetrofitsExplains reviewing service, feeders and VFD additions when replacing units; does not cover SCCR.
- Utility Incentives and Rebates for AHU RetrofitsExplains common US and Canadian utility incentive structures for fan, motor and recovery upgrades; payback math is separate.
- AHU Retrofits in Heritage and Historic BuildingsExplains constraints of historic fabric, routing and access in heritage retrofits; does not cover field surveys.
comparisons
- Retrofit vs Full Replacement: How to DecideCompares refurbishing an existing AHU with replacing it on condition, cost, downtime and performance; does not cover like-for-like design choices.
- Like-for-Like Replacement vs Redesigned ReplacementCompares matching the old unit's duty versus re-engineering to current loads and codes; does not cover the retrofit vs replace decision.
- Bolted Modular Panel vs Welded-Frame Knockdown UnitsCompares knockdown construction methods on leakage, assembly time and strength; does not explain knockdown basics.
how tos
- How to Retrofit a Fan Array Into an Existing AHUSteps to remove old fans and install a fan array in an existing casing; new fan array selection basics are in fans.
- How to Rebuild an AHU in PlaceSteps for rebuilding casing, coils and fans within the existing footprint; knockdown construction explanation is separate.
- How to Replace an AHU in an Occupied BuildingSteps for phasing, temporary isolation and tenant communication during replacement; hospital ICRA is in healthcare.
- How to Replace Coils in Existing AHUsSteps to measure, specify and install replacement coils through limited access; coil selection basics are in coils.
- How to Provide Temporary Heating and Cooling During AHU ReplacementSteps to size and connect temporary units during shutdown; does not cover occupied-building phasing.
- How to Replace Packaged RTUs With Custom Outdoor AHUsSteps to match curbs, structure and duct openings when upgrading RTUs to custom units; does not compare system types.
- How to Survey an Existing Mechanical Room With Laser ScanningSteps for measuring access routes and room geometry with tape and 3D scanning; does not cover shipping split design.
- How to Convert a Constant Volume AHU to VAVSteps for adding VFDs, terminal boxes and controls to CV systems; does not cover fan array retrofits.
checklists
- AHU Condition Assessment ChecklistChecklist for rating casing, coils, fans, dampers and controls to inform repair or replace; does not include financial analysis.
- Structural Review Checklist for Replacement UnitsChecklist comparing new and old unit weights, point loads and support for structural review; does not cover rigging.
- Retrofit Shutdown Planning ChecklistChecklist of lead times, shutdown windows, crews and contingencies for retrofit cutovers; temporary HVAC sizing is separate.
- Knockdown Unit Field Assembly QA ChecklistChecklist of sealing, fastening, alignment and leak test checks during knockdown assembly; general split section joining is in installation.
calculations
- Calculating Payback for AHU Retrofit ProjectsCalculates simple payback and NPV for retrofit options; post-retrofit savings verification is separate.
- Measuring Retrofit Savings With IPMVP OptionsCalculates verified savings using IPMVP options A to D; does not estimate payback beforehand.
troubleshootings
spec guides
Ready to build the unit your project actually needs?
Send a schedule, a drawing or a photo of the unit you are replacing. An application engineer calls back within one business day.