25 guidesengineering guides
Operation, Maintenance and Troubleshooting
Maintaining operating AHUs and diagnosing problems in service.
checklists
- AHU Preventive Maintenance Schedule ChecklistChecklist of monthly, quarterly and annual maintenance tasks; ASHRAE 180 standard scope is in codes.
- Seasonal Changeover Checklist for AHUsChecklist for heating-to-cooling and cooling-to-heating changeovers including freeze readiness; does not cover daily operation.
- Critical Spare Parts List for AHUsChecklist of spare belts, bearings, filters, actuators and drive components to stock; does not cover maintenance labour.
how tos
- How to Lubricate Fan Bearings CorrectlySteps for grease type, quantity and intervals and avoiding over-greasing; bearing failure diagnosis is separate.
- How to Clean AHU Coils Without DamageSteps for comb, foam, pressure and steam cleaning and when each is safe; capacity diagnosis is in coils.
- How to Tension and Align Fan BeltsSteps for checking tension, sheave alignment and belt replacement; belt drive design is in motors.
- How to Replace AHU Filters Safely and Without BypassSteps for safe filter change-out, seating and gauge reset; filter loading troubleshooting is in filtration.
- How to Clean Drain Pans and Prevent BiofilmSteps for cleaning pans and traps and using treatments; microbial growth diagnosis is in filtration.
- How to Recommission an Existing AHUSteps for retro-commissioning sequences, sensors and setpoints on existing units; new-building Cx is in installation.
- How to Apply Lockout/Tagout for AHU ServiceSteps for isolating fans, VFDs, steam and freewheeling fans before entry; does not cover general PM tasks.
- How to Repair Corroded Casings and FloorsSteps to assess, patch and recoat corroded panels and floors; new coating selection is in casing.
- How to Maintain Steam and Adiabatic HumidifiersSteps for cleaning, descaling, flushing and inspecting humidifiers; hygiene risk checklist is in humidity control.
explainers
- Vibration Analysis for Predictive MaintenanceExplains trending vibration spectra to predict bearing and alignment faults; acute vibration troubleshooting is in acoustics.
- AHU Life Expectancy and End-of-Life IndicatorsExplains typical service life of AHU components and signs of end of life; formal condition assessment is in retrofit.
- Continuous Condition Monitoring Sensors for AHUsExplains wireless vibration, temperature and current sensors for remote monitoring; vibration analysis method is separate.
- Setting Up AHUs in a CMMS: Asset Hierarchy and TaggingExplains component hierarchy, nameplate data and tagging for maintenance software; does not cover PM frequencies.
troubleshootings
- Troubleshooting High Static Pressure in an Operating AHUDiagnoses dirty filters, closed dampers and duct blockages causing high static; new-install duct mismatch is in retrofit.
- Troubleshooting Cooling Coil Water CarryoverDiagnoses wet filters and ducts from coil carryover on operating units; humidifier wetting is in humidity control.
- Troubleshooting Damper Linkage, Actuator and Seal FailuresDiagnoses dampers that stick, leak or fail to stroke; economizer logic faults are in controls.
- Root Cause Analysis for Induction Motor FailuresDiagnoses winding, bearing and supply-related motor failures; EC motor faults are in motors.
- Troubleshooting Frozen and Burst CoilsDiagnoses why a coil froze in service and immediate response steps; freeze protection design is in coils.
- Troubleshooting Fan Bearing FailuresDiagnoses overheating, noise and premature bearing failure causes; VFD bearing currents are in motors.
- Troubleshooting Supply Air Temperature Not Meeting SetpointDiagnoses SAT deviations from valve, coil, sensor and plant causes; loop tuning is in controls.
calculations
- Estimating Annual AHU Maintenance Labour HoursCalculates maintenance labour from component counts and task frequencies; does not cover filter change economics.
- Calculating the Optimal Filter Change PointCalculates the pressure drop at which replacing filters minimizes total cost; filter type comparison is in filtration.
Ready to build the unit your project actually needs?
Send a schedule, a drawing or a photo of the unit you are replacing. An application engineer calls back within one business day.