25 guidesengineering guides
Installation, Rigging and Startup
Delivering, rigging, setting, connecting, starting up and commissioning air handling units.
comparisons
how tos
- How to Plan a Crane Lift for AHU SectionsSteps for lift weights, pick points, spreader bars and crane sizing; does not compare rigging methods.
- How to Join AHU Shipping Sections in the FieldSteps for aligning, bolting and sealing split sections and reconnecting wiring; knockdown assembly QA is in retrofit.
- How to Install Seismic Restraints for AHUsSteps for installing restraints, snubbers and anchors per approved details; certification is in codes.
- How to Make Duct Connections at AHU OpeningsSteps for flexible connectors, transitions and fitting distances at unit openings; system effect theory is in fans.
- How to Start Up Fans: Rotation, Speed and Vibration ChecksSteps for bumping fans, verifying rotation and recording baseline vibration; startup problems are separate.
- How to Perform Field Casing Leakage TestingSteps for pressurizing installed units and measuring leakage on site; factory testing is in casing.
- How to Install and Flash a Roof Curb for an Outdoor AHUSteps for setting, leveling, flashing and sealing roof curbs; support method comparison is in casing.
- How to Protect Coils From Freezing During ConstructionSteps to drain, glycol-fill or heat coils before systems are commissioned in cold weather; design-stage freeze protection is in coils.
- How to Adjust Spring Isolators After Setting the UnitSteps to load, level and release spring isolators and check deflection; isolator selection is in acoustics.
checklists
- AHU Receiving Inspection ChecklistChecklist for inspecting and documenting shipments for damage and missing items at delivery; storage is separate.
- AHU Pre-Startup ChecklistChecklist of mechanical, electrical and controls checks before first run; VFD parameters are in motors.
- Jobsite and Long-Term Storage Checklist for AHUsChecklist for protecting units, bearings and controls stored before startup; receiving inspection is separate.
- AHU Turnover Documentation ChecklistChecklist of O&M manuals, as-builts, test reports and training records for handover; does not cover commissioning steps.
explainers
- Leveling Tolerances for Multi-Section AHUsExplains why level and flatness matter for doors, drains and section joints and typical tolerances; housekeeping pads are covered with trap sizing.
- Field Wiring Between Shipping SectionsExplains factory harnesses, junction boxes and field interconnects across splits; disconnect placement is in motors.
- Testing, Adjusting and Balancing (TAB) for AHUsExplains TAB scope and standards (AABC, NEBB, TABB) for air handlers; pitot traverses are a separate calculation.
- Functional Performance Testing of AHUsExplains FPT scripts that verify sequences and safeties; does not explain the overall Cx process.
- The Commissioning Process for AHUs (ASHRAE 202 and CSA Z320)Explains Cx phases from OPR to post-occupancy for air handlers; FPT detail is separate.
- Electrical Working Clearances Around AHU PanelsExplains NEC 110.26 and CEC working space requirements at control panels and VFDs; disconnect location rules are in motors.
calculations
- Sizing Condensate Traps and Housekeeping Pad HeightCalculates trap depth for draw-through and blow-through pans and the resulting pad height; drain pan design is in casing.
- Verifying Airflow With a Pitot Tube TraverseCalculates airflow from traverse readings using log-Tchebycheff points; does not explain TAB scope.
troubleshootings
- Troubleshooting Common AHU Startup ProblemsDiagnoses wrong rotation, tripped safeties, miswired sensors and damper issues at first start; condensate failures are separate.
- Troubleshooting Condensate Drainage Failures at StartupDiagnoses overflowing pans, dry traps and blow-out at initial operation; trap sizing math is separate.
spec guides
Ready to build the unit your project actually needs?
Send a schedule, a drawing or a photo of the unit you are replacing. An application engineer calls back within one business day.