25 guidesengineering guides
Filtration and Indoor Air Quality
Filter ratings, filter bank design, air cleaning and ventilation for indoor air quality.
explainers
- MERV Ratings and ASHRAE 52.2 Testing ExplainedExplains how MERV values are derived from particle size efficiency testing; does not compare MERV to ISO 16890.
- HEPA and ULPA Filters: Classes and TestingExplains HEPA/ULPA efficiency definitions, IEST and EN 1822 classes; cleanroom integrity testing is in labs.
- Filter Bypass Leakage and Holding Frame DesignExplains how frame and gasket leakage degrades installed efficiency; does not cover filter rating tests.
- UV-C Coil and Drain Pan IrradiationExplains germicidal UV fixture placement, intensity and safety for coil surfaces; does not compare UV with other air cleaners.
- The ASHRAE 62.1 IAQ Procedure and When to Use ItExplains performance-based IAQP design with contaminant mass balance and enhanced filtration; prescriptive VRP math is separate.
- Gas-Phase Filtration With Activated Carbon and PermanganateExplains sorbent media, residence time and targeted contaminants; data center corrosive gas classes are in data centers.
- ASHRAE Standard 241: Equivalent Clean AirflowExplains equivalent clean airflow targets and how AHU filtration and outdoor air contribute; healthcare ventilation codes are separate.
- How Face Velocity Affects Filter Efficiency and Pressure DropExplains velocity dependence of filter performance and why rated velocity matters; does not size the AHU cross-section.
comparisons
- ISO 16890 vs MERV: Comparing Filter Rating SystemsCompares ePM1, ePM2.5 and ePM10 classes to MERV and why they do not map one-to-one; does not explain HEPA classes.
- Bag vs Rigid Box vs Mini-Pleat V-Bank FiltersCompares high-efficiency filter formats for pressure drop, dust holding and space; does not compare media fiber types.
- Side-Access vs Front-Load Filter HousingsCompares filter loading arrangements for service space and leakage; bag-in/bag-out housings are in labs.
- UV-C vs Bipolar Ionization vs PCO Air CleanersCompares evidence, byproducts and testing standards for supplemental air cleaning technologies; coil irradiation design is a separate guide.
- Filter Monitoring: Gauges vs Pressure TransmittersCompares local differential gauges and BAS transmitters for filter monitoring; does not cover change-out economics.
- Synthetic vs Glass Fiber Filter MediaCompares media types for efficiency stability, electrostatic charge loss and humidity tolerance; does not compare filter formats.
calculations
- Designing With Initial, Mid-Life and Final Filter Pressure DropCalculates which filter pressure drop to carry in the fan selection; does not cover filter energy cost.
- Calculating Filter Life-Cycle Cost Including Fan EnergyCompares filter options by purchase, labour and fan energy over their life; does not set change-out intervals.
- ASHRAE 62.1 Ventilation Rate Procedure: Outdoor Air CalculationWorks zone and system outdoor air calculations including ventilation efficiency; does not cover the IAQ procedure.
how tos
- How to Arrange Prefilters and Final FiltersSteps for staging prefilter and final filter banks and their positions relative to coils and fans; does not compare media types.
- How to Prepare AHUs for Wildfire Smoke EventsSteps from ASHRAE Guideline 44 for filtration upgrades and outdoor air strategies during smoke; does not cover ASHRAE 241.
- How to Locate Outdoor Air Intakes to Avoid Re-EntrainmentUses ASHRAE 62.1 separation distances to place intakes away from exhausts and contaminants; does not cover snow intrusion.
troubleshootings
- Troubleshooting Premature Filter Loading, Blowout and BypassDiagnoses short filter life, collapsed media and bypass on operating units; does not set change intervals.
- Solving Snow and Rain Intrusion at Outdoor Air IntakesDiagnoses and fixes water and snow entry through louvers and hoods in cold climates; does not cover intake siting.
- Diagnosing Mold and Microbial Growth Inside AHUsDiagnoses causes of biological growth in pans, liners and filters and corrective actions; humidifier hygiene is in humidity control.
checklists
- AHU Filter Selection ChecklistChecklist of efficiency target, format, pressure drop, space and access items for filter selection; does not cover flush-out.
- Building Flush-Out and Filter Replacement Before OccupancyChecklist for construction filtration, flush-out volumes and filter replacement before turnover; does not cover LEED credit strategy.
Ready to build the unit your project actually needs?
Send a schedule, a drawing or a photo of the unit you are replacing. An application engineer calls back within one business day.