25 guidesengineering guides
Commercial, Education and Institutional Buildings
Air handling design for offices, schools, universities, assembly and other institutional buildings.
explainers
- K-12 School Air Handler Ventilation DesignExplains classroom ventilation rates, filtration and DOAS options for schools; acoustic criteria are separate.
- Office Building VAV Air Handler DesignExplains typical office AHU duty, turndown and zoning for VAV systems; floor-by-floor comparison is separate.
- Auditorium and Theater Air HandlingExplains low-velocity, low-noise supply and high occupant loads for assembly spaces; gymnasiums are separate.
- Retail and Big-Box Store Air HandlingExplains high-bay retail ventilation, destratification and zoning; warehouses are in industrial.
- Dormitory and Residence Hall VentilationExplains DOAS and corridor supply approaches for student housing; multi-unit residential corridor pressurization is separate.
- Underfloor Air Distribution and AHU RequirementsExplains UFAD supply temperature, plenum pressure and AHU implications; displacement ventilation is separate.
- Classroom Acoustics and ANSI S12.60 for HVACExplains classroom background noise limits and their effect on AHU location and attenuation; general acoustic calculations are in acoustics.
- Ice Arena Dehumidification and Air HandlingExplains fog prevention, low dew points and heating for rinks common in Canada; natatoriums are in humidity control.
- Air Handling for Atriums and High-Ceiling SpacesExplains stratification, smoke exhaust interaction and supply strategies in atriums and terminals; retail high bay is separate.
spec guides
- Writing to University Campus AHU Design StandardsHow to align AHU specs with campus owner standards and common university requirements; does not cover K-12.
- Specifying Museum and Archive Climate ClassesHow to specify ASHRAE museum climate classes (AA to D) for temperature and RH stability; general humidity targets are in humidity control.
how tos
- How to Design Gymnasium Air Handling for Occupancy SwingsSteps for sizing and controlling gym AHUs from empty to full assembly; does not cover natatoriums.
- How to Size and Temper Commercial Kitchen Makeup AirSteps to balance kitchen hood exhaust with tempered makeup air; industrial makeup air is in industrial.
- How to Replace School AHUs Within a Summer BreakHow to schedule procurement, demolition and startup to fit a school's summer window; general retrofit phasing is in retrofit.
- How to Design Air Handling for Intermittent OccupancySteps for pre-conditioning and ventilating houses of worship and halls used a few hours a week; auditoriums are separate.
- How to Verify Classroom Ventilation With CO2 MeasurementsSteps to use CO2 decay and steady-state readings to verify outdoor air per student; DCV control is in controls.
- How to Zone AHUs in Mixed-Use BuildingsSteps to group retail, office and residential loads onto air handlers; does not cover office tower floor-by-floor comparisons.
checklists
- Correctional Facility AHU Security ChecklistChecklist of security grilles, tamper-proof hardware and access control for detention AHUs; does not cover general commercial design.
- Hotel and Hospitality Ventilation ChecklistChecklist of guestroom, corridor, ballroom and kitchen ventilation items for hotels; does not cover dormitories.
- K-12 AHU Design ChecklistChecklist of ventilation, acoustics, filtration, security and maintainability items for school AHUs; does not cover summer scheduling.
comparisons
- Displacement vs Mixing Ventilation in ClassroomsCompares displacement and overhead mixing systems for schools on IAQ, energy and noise; does not cover UFAD.
- Central Plant vs Floor-by-Floor AHUs in Office TowersCompares central air handlers with floor-by-floor units for tenant flexibility, risers and energy; does not cover VAV design.
calculations
- Estimating Annual AHU Energy Use for an Office BuildingCalculates fan, heating and cooling energy of an office AHU from schedules and bins; retrofit savings measurement is in retrofit.
- Calculating Corridor Makeup Air for Multi-Unit Residential BuildingsCalculates corridor supply airflow for pressurization in MURBs; dormitory systems are separate.
troubleshootings
Ready to build the unit your project actually needs?
Send a schedule, a drawing or a photo of the unit you are replacing. An application engineer calls back within one business day.